Powering Tomorrow   Today

End-to-end EPC for utility-scale solar parks and grid-scale BESS — backed by an upcoming cell-to-container BESS manufacturing facility in Jaipur, Rajasthan.

Scroll to explore

Chapter 01 · Generation

India needs 10 GW
of new solar a year.

OpenEnergy delivers utility-scale solar parks engineered for the 50°C Indian grid — bifacial TOPCon modules, smart trackers, and yield-optimized layouts across Rajasthan, Gujarat, and the Deccan plateau.

Chapter 02 · Storage

Solar without storage
is half a solution.

BESS makes solar dispatchable. We engineer, procure, and integrate grid-scale LFP battery systems — liquid-cooled, augmentation-ready — turning intermittent generation into firm, 24/7 power.

Chapter 03 · Manufacturing

Cell to container.
Owned end-to-end.

Our Jaipur facility will be one of India's first vertically-integrated BESS plants — assembling cells into modules, modules into racks, and racks into containers, all under one MNRE-compliant roof.

Chapter 04 · Deployment

50 MW / 100 MWh
breaks ground in Rajasthan.

Our anchor BESS deployment demonstrates sub-second grid response, 2-hour duration, and a 20-year performance warranty — backed by in-house manufacturing and a Tesla-trained engineering team.

OpenEnergy

Build your park
with us.

Submit Project Brief
2026 Founded · Jaipur, Rajasthan
Cell → Container Vertical integration roadmap
50 MW / 100 MWh Anchor BESS pipeline · Rajasthan
2 GWh / yr Manufacturing capacity target
CEA + CEIG Statutory compliance framework

Why OpenEnergy

Founded by battery engineers
who have built at scale.

01

Vertically integrated

We don't broker BESS — we build it. From cell qualification to container assembly, our Jaipur facility lets us guarantee specifications, lead times, and warranty terms most EPCs can only pass through.

02

Built for the Indian grid

Designs tuned for 50°C ambient, monsoon humidity, and the CEA grid code. IEC 62933, UL 9540A, and CEIG approvals built into every package as standard — not as extras.

03

Single-source accountability

One contract, one PM, one warranty. No finger-pointing between OEM and EPC when an inverter trips at 2 AM — we own it because we built it. End-to-end responsibility, contractually.

04

Bankable from day one

Designs, BoMs, and contracts structured to lender norms — IREDA, PFC, REC, and commercial bank-ready DPRs out of the box. We model for lenders before we model for construction.

What We Deliver

Three integrated capabilities.
One accountable EPC.

From utility-scale solar parks to grid-scale battery storage assembled in-house — engineered, procured, and built for India.

01 · EPC

Solar EPC

Turnkey utility-scale photovoltaic parks for IPPs and C&I open-access developers across India.

Capacity5 – 500 MWp
ModulesBifacial TOPCon / mono-PERC, ALMM-listed
TopologyFixed-tilt & single-axis tracker
BoPHV switchyard, evacuation, SCADA
ComplianceCEA · CEIG · State DISCOM

03 · Sub-EPC

Package Contracting

BoP, MMS, civil, and HV packages for tier-1 EPCs. BESS supply at container or rack level.

ScopeBoP · MMS · Civil · HV
BESS supplyContainer or rack-level
EngineeringPVsyst · ETAP · DigSILENT
O&M2–25 yr terms, PR guarantee
GeographyPan-India · Rajasthan-anchored

Manufacturing

Cell-to-container,
in Rajasthan.

OpenEnergy is establishing a vertically-integrated BESS assembly facility in Jaipur — designed to qualify cells, assemble modules and racks, and deliver containerised energy storage systems built to Indian grid conditions.

FACILITYJaipur, Rajasthan
SCOPECell qualification → Module → Rack → Container
CHEMISTRYLFP prismatic & blade-format
TARGET CAPACITY2 GWh / yr (phased rollout)
COMMISSIONINGPhased · 2026 → 2027
COMPLIANCEUL 9540A · IEC 62619 · ALMM (when issued)

Production flow

01 Cell qualification

Incoming inspection, capacity binning, abuse testing

02 Module assembly

Welding, BMS integration, insulation testing

03 Rack build

Mechanical, electrical, thermal sub-assembly

04 Container integration

HVAC, fire suppression, PCS, EMS, FAT

Execution

A documented EPC process,
end to end.

Every project follows a fixed, lender-documented methodology — from the first yield model to 25 years of O&M.

01

Feasibility

Yield modeling (PVsyst), grid study, land due diligence, NPV / IRR analysis.

02

DPR & Engineering

Lender-ready DPR, PFD, SLD, GA drawings, BoQ and cost benchmarking.

03

Procurement

Module, inverter, BESS, BoP. ALMM-tracked, FAT-witnessed, delivery-guaranteed.

04

Construction

Civil, MMS, DC/AC, HV switchyard and grid evacuation. Safety-led execution.

05

Commissioning

Pre-comm checks, SAT, CEIG inspection, COD documentation and handover.

06

O&M Handover

2–25 yr O&M with PR guarantee, SCADA and drone thermography monitoring.

Technology

Engineered for the Indian grid.

01

High-Efficiency PV Modules

Bifacial monocrystalline TOPCon panels, ALMM-listed and field-validated for 50°C ambient — achieving up to 23% efficiency across Rajasthan, Gujarat, and the Deccan plateau.

02

Liquid-Cooled LFP BESS

LFP chemistry with active liquid thermal management — ensuring safety, longevity, and consistent round-trip efficiency above 92% in any Indian climate. IEC 62933 compliant.

03

AI-Powered Grid Dispatch

Machine-learning EMS that predicts demand, schedules charge/discharge, and optimises ancillary-services revenue in real time — CEA Grid Code and IEC 62933 compliant.

04

SCADA & Remote Monitoring

24/7 SCADA with IoT asset monitoring, predictive maintenance alerts, drone thermography, and live performance dashboards — across every site, any time.

About Us

Energy independence
at national scale.

OpenEnergy is an Indian EPC and BESS manufacturer dedicated to accelerating the country's transition to clean, dispatchable power. We design, build, and locally manufacture the storage that turns intermittent renewables into reliable infrastructure — so utilities, IPPs, and industries don't have to choose between affordability and reliability.

Founded on a single conviction: India will not import its way to a renewable grid. The cells, the engineering, the assembly, and the accountability all need to live in-country. OpenEnergy is built around that thesis.

AD

Aryan Dua

Founder & CEO

Battery engineering at Tesla — design and manufacturing of energy storage systems at the world's most demanding standards. Founded OpenEnergy to bring that engineering rigour to India's grid.

Battery cell engineering · BMS · BESS manufacturing · Grid storage

Get In Touch

Have a project
under planning?

Send us your tender pack, land status, or grid connectivity letter. We respond within 48 hours with a preliminary scope and rough order of magnitude — no boilerplate, no unsolicited calls.

Project intake

RFP · v1.0

Files (tender pack, DPR, drawings) can be shared over a secure link after first response.

01 · INTAKE
You send · we read

Every RFP is reviewed by an engineer, not a salesperson. No automated triage.

02 · 48 HOURS
Preliminary response

Scope outline, indicative tariff band, and clarifying questions — typically a one-pager.

03 · DEEP DIVE
Site walk & DPR

If aligned, we visit the site and issue a bankable DPR within 3–4 weeks.

04 · CONTRACT
EPC commitment

Fixed-price, milestone-linked EPC with PR guarantees and lender-ready documentation.